Herunterladen Inhalt Inhalt Diese Seite drucken

Parkside PBK 4 B3 Bedienungs- Und Sicherheitshinweise Originalbetriebsanleitung Seite 10

Benzin-kombigerät 4-in-1
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

116
40:1
4
GB/IE/NI
GB
IE
NI
Pay attention to electrical connection cables! Keep a distance of at least 10 m.
GB
IE
NI
Specification of the guaranteed sound power level L
Attention! The exhaust pipe and other parts of the engine become very hot during
GB
IE
NI
operation, do not touch!
GB
IE
NI
Attention! Hot parts. Keep distance.
Important. Always switch off the engine before refuelling.
GB
IE
NI
Do not refill during operation.
Mixing ratio: 40 parts petrol to 1 part oil
Petrol: ROZ 95/ROZ 98
2-stroke engine oil: ISO-L-EGD/JASO FD
GB
IE
NI
Attention! Petrol is very easily flammable. Avoid smoking, naked flames or flying sparks
near fuel.
Do not fill with E10 fuel!
Tank content 1200cm³.
GB
IE
NI
GB
IE
NI
Mixing ratio: 40 parts petrol to 1 part oil
GB
IE
NI
Press the fuel pump (primer) 7x.
GB
IE
NI
Turn the choke lever.
in dB.
WA

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis