Herunterladen Inhalt Inhalt Diese Seite drucken

CLIVET STANDING 2 IS3-XY 140M Serie Handbuch Seite 47

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
4 Installing the rodent proof wire mesh
– Remove the rodent proof wire mesh from the pipe
on the unit by gently tapping it
– Use the tip of a knife to make a small hole, following
the marking on the rat proof closure plug.
– Fit the rat proof closure plug on the unit and firmly
hold it in place.
Marking
Rat proof
closure plug
First remove the metal
Fit the rat proof
closure plug into
the hole
Fig. 6
5 Pipes and tying
– Install the earth connection pipes. Put the drainage
pipe, the refrigerant pipe and all electrical cables
in position (ensuring that both ends are correctly
placed) next to the pipe.
– Using the drainage pipe as a guide, measure and
adjust the length of the low voltage wiring, high
voltage wiring, any other electrical wiring and the
refrigerant pipe. Use the cable ties to initially fasten
them in place.
– Arrange the pipe so that the drainage pipe is at the
bottom, the connection pipe is in the middle and
the electrical wiring is at the top.
– Use vinyl adhesive tape to start tying the pipes
together. Start tying the bottom end of the flexible
drainage hose with the adhesive tape and make
sure that the connectors are fastened properly.
Position of the pipe/wire hole on both sides
Refrigerant/drainage pipe
hole Ø67
Position of the pipe/wire hole on the bottom
Refrigerant/drainage pipe
hole Ø57.4
Fig. 7
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis