Herunterladen Inhalt Inhalt Diese Seite drucken

RUSTA ADVANCED Gebrauchsanweisung Seite 10

550x400 cm
Vorschau ausblenden Andere Handbücher für ADVANCED:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

ENG
MAINTENANCE REQUIREMENT FOR ENCLOSURE NET
Your trampoline enclosure netting is manufactured with UV resistant material. Despite
this the netting is exposed to the outdoor elements including sunlight, wind, rain and wild-
life. The net surrounding the trampoline must be checked prior to each use. This includes,
but is not limited to inspecting the net for cracks, excess wear, brittleness, and stretching.
Also inspect all connections and the entire enclosure for overall integrity. The net must
be immediately replaced if it shows any signs of wear, damage, stretching, cracking,
looseness, brittleness or other losses in integrity. The following Maintenance Schedule
must be followed:
1 to 6 Months
Inspect the enclosure (net,
net hanger, and straps)
prior to every use.
IT IS RECOMMENDED THAT THE NET BE REPLACED ON A YEARLY BASIS UNDER
NORMAL USE, EVEN IF IT DOES NOT SHOW ANY VISIBLE SIGNS OF DAMAGE.
How to Inspect the Trampoline Net for Proper Use.
Always check the enclosure netting for signs of UV damage, deterioration, brittleness,
cracking, and tearing every time before using the trampoline and enclosure.
Step 1 - Inspect the enclosure netting before EACH use for wear or tear by pinching
and pulling a section of the netting between fi ngers and pulling downward. Please
see diagram below.
If it produces any tear or cracking or ripping sound, then the net is unsafe and MUST
be taken down immediately. STOP USING THE TRAMPOLINE ENCLOSURE IF YOU
FIND ANY SIGNS OF WEAR OR TEARING ON THE NETTING.
Step 2 - Walk around the whole perimeter of the trampoline to visually check for
material deterioration or other damage.
10
IM_759013120301_Trampoline_Advanced_550x400cm_v3.indd 10
6 to 18 Months
Thorough inspection for UV
damage and prior to every
use for net, net hanger and
straps.
18 to 36 Months
Thorough inspection
before every use on net,
net hanger, straps, zippers,
ties and strings. Replace
after 36 months or earlier
if necessary.
2021-01-27 17:49

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

759013120301

Inhaltsverzeichnis