Herunterladen Inhalt Inhalt Diese Seite drucken

SolarV EPEVER UPower-Hi Serie Betriebsanleitung Seite 90

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

When the battery voltage goes lower than or equal to the LVD point, only PV charges the battery.
③ PV power is not available, and the utility is available.
The battery voltage goes lower than or equal to AON. Simultaneously, it has not been charged to
AOF. Instead, the utility supplies the load and charges the battery.
④ Both PV power and utility are not available.
Before the battery voltage drops to the LVD point, the battery supplies the load.
4)
Input source: Solar Priority
Output source: Utility Priority
① Both PV and utility are available
www.solarv.de
The battery supplies the load alone.
PV charges the battery, and the utility supplies the load.
31
Copyright © 2021 SolarV GmbH All rights reserved
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis