Herunterladen Inhalt Inhalt Diese Seite drucken

SolarV EPEVER UPower-Hi Serie Betriebsanleitung Seite 73

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step3: Rotate the direction of mounting plate 1 and plate 2, install them again.
2.4 Install the inverter/charger
Risk of explosion! Never install the inverter/charger in a sealed enclose with flooded
batteries! Do not install the inverter/charger in a confined area where the battery gas
WARNING
can accumulate.
 The inverter/charger can be fixed to the concrete and solid brick walls and cannot
 The inverter/charger requires at least 20cm of clearance right and left and 50cm of
CAUTION
Step1: Determine the installation location and heat-
dissipation space. The inverter/charger requires at
least 20cm of clearance right and left and 50cm of
clearance above and below.
Step2: According to the installation position marked with the mounting plate 1, drill two M10
holes with an electric drill.
Step3: Insert the screws of the M8 bolts and the steel pipes into the two M10 holes.
Step4: Install the inverter/charger and determine the installation position of the M10 hole
(located at the bottom of the inverter/charge).
www.solarv.de
be fixed to the hollow brick wall.
clearance above and below.
14
Copyright © 2021 SolarV GmbH All rights reserved
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis