Herunterladen Inhalt Inhalt Diese Seite drucken

Endress+Hauser Proline Prosonic Flow P 500 Installationsanleitung Seite 15

Austausch sensor, sensorhalterung, installations set
Vorschau ausblenden Andere Handbücher für Proline Prosonic Flow P 500:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9.
Draw the length of the arc from the center line out to both sides and mark the drill
holes.
10. Create drill holes and prepare them for welding in the sensor holders (deburr, clean).
Drill holes for the sensor holders are paired together (CH 1 - CH 1 and CH 2 - CH 2).
11. Insert sensor holders into the first two drill holes and align them with the path rod
(alignment tool). Spot-weld with the welding device and then weld both sensor holders
together. To align the path rod, screw both guide bushes into the sensor holders.
12. Weld in both sensor holders.
13. Check the path length, sensor distances and arc lengths again. Deviations can be
entered as correction factors later on when commissioning the measuring point.
Endress+Hauser
CH 1
CH 2
CH 2
EA01368D
CH 1
15

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Prosonic flow i 400Prosonic flow w 400

Inhaltsverzeichnis