Herunterladen Inhalt Inhalt Diese Seite drucken

Faults - WIKA GDM-100-T Betriebsanleitung

Hybrid-gasdichtewächter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5. Commissioning, operation / 6. Faults
5.6.5 Pin assignment of integrated, analogue transmitter (model GD-20-A)
4 ... 20 mA current signal in rear cable socket
Rear cable socket
EN
1
U
DC 10 ... 30 V
+
2
-
-
3
U
Ground
-
4
-
-
-
-
5
6
-
-
5.6.6 Requirement for shield and grounding
The gas density sensor must be shielded and grounded in accordance with the ground-
ing concept of the plant.
5.6.7 Connecting the instrument
1. Assemble the mating connector or cable outlet.
→ For pin assignments, see the following chapters:
5.3.2 "Pin assignment of attached, digital transmitter (model GD-20-D)"
5.3.3 "Pin assignment of integrated, digital transmitter (model GD-20-D)"
5.6.3 "Pin assignment of attached, analogue transmitter (model GD-20-A)"
5.6.4 "Pin assignment of attached, analogue transmitter with cable outlet (model
GD-20-A)"
5.6.5 "Pin assignment of integrated, analogue transmitter (model GD-20-A)"
2. Establish the plug connection.

6. Faults

28
CAUTION!
Physical injuries and damage to property and the environment
If faults cannot be eliminated by means of the listed measures, the instru-
ment must be taken out of operation immediately.
Ensure that pressure or signal is no longer present and protect against
accidental commissioning.
Contact the manufacturer.
If a return is needed, please follow the instructions given in chapter 8.2
"Return".
For contact details, see chapter 1 "General information" or the back page
of the operating instructions.
WIKA operating instructions, model GDM-100-T

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis