2.4- THREE PHASE CHARGING STATION AC MAINS CONNECTION

1-
Insert the cables to the terminal block as shown in the image.
Electric Terminal number with AC Cable Color.
2-
Tighten the screws on the terminal block as shown in the image with the tightening tourqe of
2.5Nm.
Electric Terminal
If the three phase charging station is requested to be installed as single phase, phase cable
connection should be done to L1 terminal as shown in figure-9.
IG v7.3.0 2021
1
2
3
4
5
© 2021 Vestel - All rights reserved
Figure-10
Earth (Green-Yellow)
Table-6
1
2
1
Check the table-6 below to match
AC Cable Color
AC L3 (Grey)
AC L2 (Black)
AC L1 (Brown)
AC Neutral (Blue)