Herunterladen Inhalt Inhalt Diese Seite drucken

Function; Operation; Display; Interaction And Connectivity - BWT AQA therm MOVE Power Einbau- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4

Function

AQA therm MOVE Power is a mobile reverse os-
mosis unit for producing low-salt water.
4 .1

Operation

● Outlet water is produced by two membrane car-
tridges that are flowed through in parallel
● Pressure is increased by the integrated pump,
and the outlet water pressure is indicated
● The pump is activated automatically using the
set switch-on/off point for pressure product
● Before each operation, lines and membrane
cartridges are rinsed for approx. 60 seconds
4 .2

Display

The product is equipped with an integrated display
and four operator keys. This display gives the user
a quick overview of all the product parameters.
Depending on the settings, the user sees the cur-
rent parameters on the display during operation:
● Litres per day counter (l)
● Current flow (l/h)
● System pressure (bar)
The main screen on the display always shows the
following data:
● Pump pressure (bar)
● Outlet water conductivity value (µS/cm) or
(ppm)
● Water temperature (°C)
● Set switch-on/off point (bar) for pressure pro-
duction
4 .3

Interaction and connectivity

The functionality of the product is enhanced with the
BWT RO systems app. The BWT RO sys-
tems app provides an overview of the current
operating parameters as well as the settings for
the operating parameters and service intervals.
You download the BWT RO systems app to your
mobile device using the QR code and connect it to
the product via Bluetooth. The range of the Blue-
tooth connection is 2 m.
5
Requirements for installa-
tion
5 .1

General

Work on the product must be performed only by
trained personnel (see chapter „1.3 Personnel qual-
ifications", Seite 31).
n Germany, the heating water must comply with the
requirements of VDI 2035; in Austria, it must com-
ply with ÖNORM H5195-1.
Local regulations for establishing the connection
between the hot water system and heating sys-
tem must be complied with. In accordance with EN
1717, a BA-type backflow prevention device must
be installed upstream from the project (e.g. AQA
therm HFB heating filling block).
Comply with the following regulations, guidelines,
and rules for the connection of the product:
● Local installation and accident prevention reg-
ulations
● General standards and directives
● General hygiene conditions
● Technical data and rules
5 .2
Installation site/location and envi-
ronment
The following requirements must be permanent-
ly ensured:
● Drinking water system connection
● Waste water drain system connection with min-
imum nominal width (see chapter „17 Technical
data", Seite 54)
● Earthed
mains
connection
„17 Technical data", Seite 54)
● Power supply and required inlet water pressure
● Dry and frost-free installation location
EN
(see
chapter
35

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis