Electrical Connection; Commissioning And Operation - Kübler Sendix S3674 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Sendix S3674:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

+V:
Encoder supply voltage +V DC
0 V:
Encoder ground GND (0V)
D+, D-:
Data signal
C+, C-:
Clock signal
A, A\:
Incremental output Channel A (Cosine)
B, B\:
Incremental output Channel B (Sine)
RS485 specifies a standard voltage range for the slave sup-
ply of 7 ... 12 V DC (including the tolerances). The supply
voltage is measured on the slave; the maximum voltage drop
over the cable length must be considered accordingly when
dimensioning the master supply.
24 - EN
RS485 specifies a maximum current consumption by the
slave of 250 mA at 7 V DC.
4.2.5 Connecting the Connecting Wires
• Before connecting the connecting wires, check the assign-
9007199428525835
ment of the single wires.
• After connecting, check the proper presence of the supply
voltage and the proper functioning.
If the supply voltage is reversed, the measuring system does
not function.

4.2.6 Electrical connection

9007199428522379
Open the plastic cover on the encoder, if necessary using a
screwdriver. Plug the male connector of the cable in the fe-
male connector of the encoder while the encoder is discon-
nected from the power. Then close the plastic cover again.
The snapping must be indicated by a clearly perceptible or
audible click.

5 Commissioning and Operation

5.1 Connecting the Connecting Wires
• Before connecting the connecting wires, check the assign-
ment of the single wires.
• After connecting, check the proper presence of the supply
voltage and the proper functioning.
If the supply voltage is reversed, the measuring system does
not function.