Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Unpacking; Installation Requirements; Mounting Orientation - Bosch Rexroth PE 2 Montageanleitung

Positioniereinheit
Inhaltsverzeichnis

Werbung

1
2

7 Assembly

7.1 Unpacking

Lift the product out of the packaging.
Dispose of the packaging in accordance with the currently applicable national
regulations in your country.

7.2 Installation requirements

When installing the product, always observe the ambient conditions specifi ed in
the Technical Data (see page 30).
7.2.1

Mounting orientation

The product should be aligned and level at right angles and parallel to the axis.
This ensures correct functioning and prevents premature wear.
7.2.2

Mounting with T-bolts

• Mount the transfer systems TS 1, TS 2plus, TS 2pv, TS 4plus, TS 5 and chain
conveyor systems VarioFlow and VarioFlow S with T-bolts and fl ange nuts.
• Make sure the T-bolt is in the correct position when inserting and tightening in the
slot. The notch at the end of the bolt indicates the T-bolt orientation.
1 = T-bolt insertion orientation in the slot.
2 = T-bolt clamping position in the slot.
Maximum tightening torque: 25 Nm.

7.3 Required tools

• Hexagon wrench (open-end) WS13.
Assembly
3 842 358 722/2015-05, MIT: PE 2, Bosch Rexroth AG
15/32

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis