Herunterladen Inhalt Inhalt Diese Seite drucken

Personal Protective Equipment; Obligations Of The System Owner - Bosch Rexroth PE 2 Montageanleitung

Positioniereinheit
Inhaltsverzeichnis

Werbung

10/32
Notes on Safety
During maintenance and
repair
During disposal
Bosch Rexroth AG, MIT: PE 2, 3 842 358 722/2015-05
• Make sure that there are no obstacles blocking access to maintenance and
inspection points.
• Perform the prescribed maintenance work at the intervals specifi ed in section 10.3,
Maintenance.
• Make sure that no lines, connectors, or components are disconnected as long
as the system is under pressure and voltage. Protect the system against being
switched on.
• Dispose of the product in accordance with the currently applicable national
regulations in your country.

2.7 Personal protective equipment

• Wear appropriate protective equipment (e.g. safety shoes, tight clothing, hairnets
for those with long hair) when working with the product.
As a plant operator, you are responsible for appropriate protective equipment when
working with the product.
All personal protective equipment must be intact.

2.8 Obligations of the system owner

• Before fi rst use or re-commissioning of a conveyor system, run a risk assessment
in accordance with DIN EN ISO 12100.
• Before initial commissioning ensure that there are no protruding or sharp-edged
parts that may endanger personnel working or moving in the area.
• Provide safety-related instructions to the operating personnel before fi rst use or
re-commissioning, and then in regular intervals.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis