INSTALLATION
GB
THE EQUIPMENT MUST BE INSTALLED "EXPERTLY" BY QUALIFIED PERSONNEL AS
REQUIRED BY LAW 46/90.
1
Position the card vertically
2
It is essential to observe polarities.
3
Different wires should be used for the various circuits.
4
Wire cross section of the equipment's line and of the motors' supply lines should be calculated on the basis of their
length and on the current absorbed.
choose alimentation 220V cable cross sections of at least 1.5 mm≤
choose motor 12V alimentation cable cross sections of at least 2.5 mm≤
5
Decoupling is advisable whenever control circuits have extremely long lines (longer than 50 m) with relays installed on
the control panel.
6
Ducts leading to and from the equipment must be connected leaving, as far as possible, their initial protection level
untouched (IP43).
7
If a fuse blows it has to be replaced with another one that has the same identical characteristics.
8
Short circuit any Normally Closed contacts that are not going to be used.
NB : it is compulsory to earth the system and to observe the safety regulations that are in force in each country
IF THESE ABOVE INSTRUCTIONS ARE NOT FOLLOWED IT COULD PREJUDICE THE PROPER WORKING ORDER
OF THE EQUIPMENT AND CREATE HAZARDOUS SITUATIONS FOR PEOPLE. FOR THIS REASON THE
"MANUFACTURER" DECLINES ALL RESPONSIBILITY FOR ANY MALFUNCTIONING AND DAMAGES THUS
RESULTING.
FINAL TEST OF THE SYSTEM
These control panels are fitted with several indicator LEDs that can help during the final testing phase:
LD5, signals the presence of the 12V dc supply voltage on terminals 1 and 2 (terminal board n° 4),
LD8, signals the presence of the 12V dc battery voltage on terminals 3 and 4 (terminal board n° 4).
Small GREEN LEDs signal the N.C. inputs; if the contacts are closed the LEDs should be on (if N.C. inputs are not used it is
necessary to connect them to the common).
A small RED LED signals the N.O. input, it is normally off, by pressing the push button the LED should turn on.
Having checked that the inputs are running properly by means of the LEDs, check that the voltage at terminals 5 and 6 is 12
V dc.
Now the motors can be connected, paying attention to movement direction, after which memorize times, set operating mode
and carry out the final test on the system.
INSTALLATION
F
L'INSTALLATION DE L'EQUIPEMENT DOIT ETRE REALISEE "SELON LES REGLES DE L'ART" PAR
LE PERSONNEL COMPETENT AYANT LES QUALITES REQUISES PAR LA LOI 46/90.
1 Positionner la carte verticalement
2 Respecter absolument les polarités.
3 On conseille l'utilisation de conducteurs différents pour les divers circuits.
4 La section des câbles de la ligne de l'appareillage et des lignes d'alimentation des moteurs sera calculée en fonction de la
leur longueur et du courant absorbé.
section minimum des câbles utilisés pour alimentation 220V 1.5 mm2
section minimum des câbles utilisés pou alimentation moteur 12V 2.5 mm2
5 Lorsque les circuits de commande présentent des lignes très longues (plus de 150 mètres), on conseille le
désaccouplement avec les relais montés près du pupitre de commande.
6 Les conduites d'entrée et de sortie de l'appareillage devront être installées en laissant de préférence inchangé le grade de
protection (IP43).
7 En cas d'intervention d'un fusible, ce dernier devra être remplacé par un autre ayant les mêmes caractéristiques.
8 Court-circuiter les contacts Normalement Fermés inutilisés.