Herunterladen Diese Seite drucken

Initial Commissioning - Kessel Comfort PLUS Einbau- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Comfort PLUS:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5

Initial commissioning

Connect the battery
Connect the battery connector(s) (2).
5.1
Connect to the mains voltage
Establish mains voltage (400V control units)
Connect the mains cable to the mains power supply.
Move main switch (1) into ON position.
✓ Initialisation starts automatically.
The device checks the electrical components.
Voltage test of the standby batteries.
Menu item
|3.10. Language|
56 / 220
Establish mains voltage (230V control units)
Switch on
Move main switch (1) into ON position. After a successful
system test, the display shows
green LED signals readiness.
If the display does not show initialisation
guage|) the control unit has already been initialised. In this
case, the set parameters must be checked or reset to the
factory settings
tory settings, the initialisation of the control unit starts auto-
matically.
Please note that the counter for the maintenance interval is
not changed by the reset to the factory settings.
is displayed.
Installation and operating manual
Insert the safety plug into the designated socket.
Move main switch (1) into ON position.
Initialisation starts automatically.
The device checks the electrical components.
Voltage test of the standby batteries.
Menu item
|3.10. Language|
(|3.11
Reset|). After resetting to the fac-
is displayed.
and the
|0 System info|
(|3.10. Lan-
010-700_02

Werbung

loading