Herunterladen Inhalt Inhalt Diese Seite drucken

First Start Up; Unpacking; Installation; Machine Positioning - Beissbarth MS 75 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
en
24|����|Firststartup
4.

First start up

4.1

Unpacking

1. Remove the packaging paying attention to nails
detaching.
i
After unpacking check the integrity of MS 75 and
check that no components are visibly damaged. In
case of doubt do not proceed to start-up and con-
tact a qualified technician and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2

Installation

4.2.1
�achinepositioning
1. Insert the appropriate lifting belts (length belt 1: 1.5
Mt, belt 2: 2 Mt), with sufficient capacity, as shown.
Warning-tiltingdanger!
The barycentre of the MS 75 is not in its
centre.
It is necessary to lift the machine slowly.
|
1 695 301 979
2011-07-16
2. Lift the MS 75 with a lift crane and install it in the
chosen area respecting the minimum distances
shown in the picture.
i
For safe and ergonomic use of the MS 75 it is recom-
mended to leave a minimum of 750 mm space from
the nearest wall and of 900 mm from the ceiling.
Warning-tiltingdanger!
During tire inflation considerable forces are
exerted.
The MS 75 has to be fixed in at least 3
MS 75 has to be fixed in at least 3
has to be fixed in at least 3
points on the floor.
Beissbarth GmbH

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis