COMMISSIONING

/
In order to shorten the commissioning time, pour approx. 5 litres of water into the salt container until
it just covers the intermediate bottom.
/
Fill 25 - 40 kg of regeneration salt into the salt container.
The regeneration salt must comply with the requirements of DIN EN 973, or local equivalent, and be of
food-grade quality.
We recommend high-grade regeneration salt in tablet form (KBN: SALZT). When using other
regeneration salts, clean the salt container (6) more often and replace the suction strainer in shorter
intervals.
/
Remove the cover.
/
Note down the installation date on the label (see fig. 10) and in the service record sheet (chapter 12).
Label "Installation date"
/
Open the water supply (main water tap or shut-off valve).
/
Ensure that the bypass valve (if installed) is set to "operation".
For safety reasons the water softener must be flushed and regenerated immedi-
ately for venting after the water supply is opened.
1. Flushing the water softener:
/
Open a water tap (if possible, near the water softener) and adjust a volume flow of approx. 500 l/h.
/
After one minute of flushing (both resin containers are vented), insert the mains plug into the mains
socket.
After connection to the mains, the control electronics will automatically perform a self-test and a pre-in-
stallation for the regulation operation.
Fig. 10: Device no., order no. and label "Installation date"