84
12
SERVICE RECORD SHEET
Date installed:
Date
Raw water hardness
measured [°dH]
Raw water hardness
set [°dH]
Mixed water hardness
measured [°dH]
Water meter [m³]
Number of
1)
regenerations
2)
Intake time
[minutes]
(approx. 3 minutes)
Wastewater produced during
salting [litres] (approx. 3.5 litres)
3)
Rinsing
(3 - 4,5 litres)
4)
Initial filtrate
(2,5 - 4 litres)
1) Is completed by the customer service department.
(G = total sum, L = prolonged salting period, N = normal regeneration, K = shortened salting period)
2) Driving wheel in position 2.
3) Driving wheel in position 3.
4) Driving wheel in position 5.
The values for intake time, wastewater produced, rinsing and initial filtrate apply to each regenera-
tion stage.
System pressure:
G
L
N
K