Inhaltsverzeichnis
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
About These Operating Instructions
48
-
Symbols and Units Used
49
-
-
-
-
-
Dangers Due to Non-Compliance
52
-
-
Electrical Devices/Equipment
54
-
-
Requirements for the Place of Installation
55
-
-
-
Mounting the Built-In Rotary Flange (Jqe)
56
-
Mounting the Bypass Valve (Jqu)
57
-
Mounting the Water Softener on the Premounted Bypass Valve
58
-
Wastewater Connection and Safety Overflow Hose
60
-
-
-
-
-
-
-
Functional Description of the Water Softener
68
-
-
-
Message in Case of Insufficient Salt
70
-
Connecting a Lan Cable
71
-
Modifications/Changes/Spare Parts
71
-
-
-
Resetting to Factory Settings
72
-
-
Display Message Overview
72
-
-
-
-
Inspection by the Operator Every Two Months (Visual Check)
74
-
Biannual Maintenance by the Operator
75
-
Annual Maintenance by the Customer Support
75
-
Message "Maintenance/Service
75
-
-
-
-
Technical Specifications
76
-
-
Installation Dimensions
79
-
-
-
-
-
-
-