Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

In addition to the above-mentioned cleaning
operations, you should also perform routine
maintenance in order to guarantee the
The operator may perform the following
maintenance operations:
---------
• Oiling carriage guide rail (5) and
product holder (4) and lubrication
points.
- Frequency: Weekly.
---------
• Oiling chain (19) and bevel gear (20).
- Frequency: Every 6 months.
(see page 36)
---------
• Blade sharpening
Periodically, or at least every 6 months,
sharpen the blade (16) as described on
page 37.
How often sharpening is
necessary and how long it lasts
depend on the type of use to

MAINTENANCE

Being particularly complicated and hazardous
for the operator, other maintenance
operations
staff from an authorised service centre.
These operations are:
• Blade replacement.
• Sharpener grinding wheel replacement.
• Chain replacement.
• Repair of structural parts, repair and/
6
Proceed in the opposite direction to what
indicated in the previous operations.
6
• At the end of use, after having thoroughly
• Is advised to cover the slicer with a towel
SHOULD
or replacement of components located
beneath the base.
.4 - Machine reassembling
.5 - Store the slicer
cleaned all components (as described in
the previous paragraphs), make sure the
graduated knob or the lever that adjusts
the thickness are taken back to "0" and
always re-position the blade guard (9).
to protect it from dust.
If it is not intended to use the slicer for
some days, store it in a sepaired and dry
place.
IT
EN
only be performed by
33

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

F300 vo l

Inhaltsverzeichnis