Herunterladen Diese Seite drucken

Control Panel - Jacuzzi J-200 Montageanweisung Und Bedienung Und Wartung

Vorschau ausblenden Andere Handbücher für J-200:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 46
6
5
2
I Addition of chemical additives at first start-up
Please refer to the Jacuzzi system water treatment guide and
relative catalogue for details on water quality maintenance,
the methods and warnings governing the use of relative
chemical products.
N.B.: Always cover the spa (except when mixing chemical
additives!) with the insulating cover, so as to reduce heating
times and thus minimize operating costs.
The time required for initial heat-up will vary depending on the
starting water temperature.
WARNING!
Do not get in the spa until the quantity of disinfectant has not
dropped below the level recommended by the manufacturer
and/or by your retailer.
Always check water temperature carefully before entering spa.

Control Panel

A Display: can display current water temperature, water tem-
perature set point, selected skimming/heating mode, and er-
ror messages.
B. ( + ) Button: increases water temperature set point.
C. ( - ) Button: decreases water temperature set point.
The range of temperature adjustment goes from 18 to 40 °C. Fac-
tory default setting is 38 °C.
D. Light button: switches the underwater light on and off.
Activates the LED lighting system, if present.
The light stays on for an hour and then switches off so that the
light bulb will last longer.
9
1
4
3
3
8
E
C
F
D
1
1
2
2
D
E
A
A
G
B
C
G
F
B
1 Electrical box
2 Power supply entrance(s)
3 2-Speed Pump (pump 1)
4 Heater
5 Pump drain plug(s)
6 1-Speed pump (pump 2)
WARNING!
DONOT LOOK AT LIT BULB
SEVERE EYE DAMAGE
OR BLINDNESS CAN OCCUR
7
7 CLEARRAY Water Purification System
8 Electronic Ballast (for CLEARRAY System)
9 Display
5
2
E. Pump 1 button: turns pump 1 on and off. Press once for low
speed; press a second time for high speed; press a third time
to turn pump off.
F. Pump 2 button (only for models with two pumps): turns pump
2 on and off. Press once to turn it on; press twice to turn pump
off.
The jets operate for 20 minutes after activation; then they switch
off automatically to conserve energy. Simply press either jets but-
ton to continue operation for an additional 20 minutes.
G. Heat Indicator: lit when heater is on.
20

Quicklinks ausblenden:

Werbung

loading

Diese Anleitung auch für:

J-210J-235J-245J-275