Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical; Charging System - Yamaha F80A Ergänzung Zur Wartungsanleitung

Vorschau ausblenden Andere Handbücher für F80A:
Inhaltsverzeichnis

Werbung

SPEC

ELECTRICAL

Item
IGNITION SYSTEM
Ignition firing order
Ignition timing
Lighting coil output peak voltage
at 400 r/min (cranking)
at 1,500 r/min
at 3,500 r/min
Lighting coil resistance (W – W)
Pick-up coil output peak voltage
(W/B – B, W/R – B)
at 400 r/min (cranking)
at 1,500 r/min
at 3,500 r/min
Pick-up coil resistance
(W/B – B, W/R – B)
CDI unit output peak voltage
(B/W – B, B/O – B)
at 400 r/min (cranking)
at 1,500 r/min
at 3,500 r/min
Spark plug lead assy. resistance
Cylinder #1 lead
Cylinder #2 lead
Cylinder #3 lead
Cylinder #4 lead
Ignition coil resistance
Primary
Secondary
IGNITION CONTROL SYSTEM
Oil pressure switch (on/off)
Engine temperature sensor
resistance
at -20 ˚C (-4 ˚F)
at 0 ˚C (32 ˚F)
at 20 ˚C (68 ˚F)
at 40 ˚C (104 ˚F)
at 60 ˚C (140 ˚F)

CHARGING SYSTEM

Rectifier/regulator output peak
voltage
at 1,500 r/min
at 3,500 r/min
MAINTENANCE SPECIFICATIONS
(W – W)
Ω @ 20 ˚C (68 ˚F)
Ω @ 20 ˚C (68 ˚F)
k Ω @ 20 ˚C (68 ˚F)
k Ω @ 20 ˚C (68 ˚F)
k Ω @ 20 ˚C (68 ˚F)
k Ω @ 20 ˚C (68 ˚F)
Ω @ 20 ˚C (68 ˚F)
k Ω @ 20 ˚C (68 ˚F)
kPa (kg/cm
(R – B)
Unit
Cylinders
Degree
V
V
V
V
V
V
V
V
V
2
, psi)
k Ω
k Ω
k Ω
k Ω
k Ω
V
V
– 8 –
Model
F80
F100
#1 → #3 → #4 → #2
5˚ ATDC ~ 25˚ BTDC
7.1
15
18
0.32 ~ 0.48
2.7
7
11
445 ~ 545
125
130
130
4.5 ~ 10.7
3.3 ~ 8.0
3.7 ~ 8.9
4.3 ~ 10.2
0.078 ~ 0.106
3.5 ~ 4.7
15 (0.15, 2.13)
15.5
5.79
2.45
1.50
0.59
14
18
E

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

F100aF80xF100x

Inhaltsverzeichnis