Herunterladen Inhalt Inhalt Diese Seite drucken

Loto - Machine Maintenance And Repair - Opex Sure Sort Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für Sure Sort:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2.7.3. LOTO - Machine maintenance and repair

This procedure should only be performed by an Authorized Employee. It
describes how to shut down and lock out the Sure Sort when maintenance or
repair by an authorized service technician is required.
Incoming power to the machine's AC Distribution enclosure remains
energized when the main disconnect switch is OFF. To fully de-energize the
AC Distribution enclosure, an Authorized Employee shall complete all steps
in "LOTO - Machine maintenance and repair", then disconnect machine from
customer's AC power source as follows:
- Plug-in machines, see
machines)" on page
- Hard-wired machines, see
machines)" on page
Power down the Sure Sort and install the lockout device as follows:
1. Notify all personnel that you are about to begin the LOTO procedure.
2. If possible, park the iBOTs.
3. Power down the RTM computer. The RTM computer must be shutdown via
remote desktop from the Host computer before powering off the Host
computer.
4. Safely shut down the host computer.
5. After the host computer shuts down, manually power down the UPS.
6. Place the "Caution" sign on the monitor (Figure 2-13).
72
DANGER
"Fully de-energizing AC power (plug-in
75.
"Fully de-energizing AC power (hard-wired
77.
Figure 2-13: Caution Sign
Sure Sort™ Operator Manual
OPEX Corporation
Safety

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis