Herunterladen Inhalt Inhalt Diese Seite drucken

Cola SPRINT maiolica Installations-, Bedienungs- Und Wartungsanleitung Seite 48

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Before working on the sheet metal tile holder, bend the tabs inward with suitable equipment to minimise
the play and ensure proper stability of the tile.
Fit the tiles checking the final coupling.
Position the upper tile in its place. Refit the
complete front panels, fixing them with the
screws (step 5).
Connect the power cable to the household
electrical system and turn on the stove, checking
its proper operation and following the instructions
in the manual supplied.
48
SPRINT ** maiolica

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Verwandte Produkte für Cola SPRINT maiolica

Inhaltsverzeichnis