Page EN-14
Materials required for assembly
Materials required for assembly
Parts list
(1) Exhaust hood
(2) upper part of the flue screen
(3) lower part of the flue screen
(4) Exhaust air operation: Exhaust air hose
(5) Check valve
(6) Wall bracket for upper flue screen
(7) Retaining plate for lower flue screen
(8) Wall bracket for exhaust hood
(9) 4 plate screws 4.0 × 8 mm
(10) Cable ties
Screws
The screws and dowels required to mount the
appliance on a wall are not included in the
package contents, as their type and dimen-
sions will vary depending on the characteris-
tics of the wall.
(1)
Please have a specialist advise you as to
which ones you need.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
In total, you will need
(9)
– 2 round-head screws (11) to attach the wall
bracket (6) for the upper flue screen (2)
– 3 countersunk screws (12) to attach the
(10)
wall bracket (8) for the exhaust hood (1),
ø 6 mm maximum
– 5 suitable dowels
Tools and aids
You will need:
– Screwdriver
– Drill with stone bit, correctly sized for the
(11) and (12) screws.
– Measuring tape / ruler
– Level
– Pencil
– Stable stepladder
– A second person to help
– Work gloves
(11)
(12)