Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Maintenance Plan - Holzmann BT 75 Betriebsanleitung

Band - tellerschleifer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

14

MAINTENANCE

The machine does not require extensive maintenance. If malfunctions and defects occur, let it be
serviced by trained persons only.
Before first operation as well as later on every 100 operation hours you should lubricate all con-
necting parts (if required, remove beforehand with a brush all swarfs and dust).
Check regularly the condition of the security stickers. Replace them if required.
Check regularly the condition of the saw band and the saw band guide.
The good condition and perfect adjustment of the guiding rollers is essential for a smooth band
guidance and a clean cut.
Store the machine in a closed, dry location.
Clean your machine regularly after every usage – it prolongs the machines lifespan and is a
pre-requisite for a safe working environment.
Repair jobs shall be performed by respectively trained professionals only!
14.1

Maintenance plan

After each workshift: Remove chips and sanding dust from the device
After 10 hours of operation: Check all screw connections and tighten if necessary.
HOLZMANN MASCHINEN Austria
Don't clean or do maintenance on the machine while it is still connected
to the power supply:
Damages to machine and injuries might occur due to unintended
switching on of the machine!
Therefore: Switch the machine off and disconnect it from the power
supply be-fore any maintenance works or cleaning is carried out
www.holzmann-maschinen.at
A T T E N T I O N
N O T I C E
MAINTENANCE
Seite 27
BT 75

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis