Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Maintenance Plan; After Each Workshift; Cleaning - Holzmann BTS 75-2 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

14

MAINTENANCE

Perform all maintenance machine settings with the machine
being disconnected from the power supply!
Serious injury due to unintentional or automatic activation of the
machine!
The machine does not require extensive maintenance. If malfunctions and defects occur, let it be
serviced by trained persons only.
Check regularly the condition of the security stickers. Replace them if required.
Check regularly the condition of the machine.
Clean your machine regularly after every usage – it prolongs the machines lifespan and is a pre-
requisite for a safe working environment.
Repair jobs shall be performed by respectively trained professionals only!
Before first operation as well as later on every 100 operation hours you should lubricate all con-
necting parts (if required, remove beforehand with a brush all swarfs and dust).
Store the machine in a closed, dry location.
14.1

Maintenance plan

After each workshift:

Clean the machine at regular intervals corresponding to the use.
Remove the dust and deposits in the housing and in the suction connections.
Check the abrasive belt regularly on wear and tear / fractions.
14.2

Cleaning

After each workshift the machine has to be cleaned. Remove dust etc. with a suitable tool.
The usage of certain solutions containing ingredients damaging metal
surfaces as well as the use of scrubbing agents will damage the
machine surface!
Clean the machine surface with a wet cloth soaked in a mild solution
Blanke Flächen der Maschine gegen Korrosion mit handelsüblichen Mitteln imprägnieren.
HOLZMANN MASCHINEN GmbH
A T T E N T I O N
N O T E
www.holzmann-maschinen.at
N O T E
MAINTENANCE
23
BTS 75-2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis