Herunterladen Inhalt Inhalt Diese Seite drucken

Operational Start-Up; Assembly; Connection Of The Pressure Line - FLORABEST FTP 400 D3 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für FTP 400 D3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operational

Assembly

To screw-on the adaptor:
1. Screw the angle adaptor (12)
and the hose adaptor (10) onto
the pump outlet (5).
To mount the float switch
height adjustment:
switch height adjustment (7) and
push the adjustment over the
moves upward (arrow
up) (see „Operation").
Connection of the pressure
line
pump is implemented either
• If using a ½" hose, attach the
hose over the pump's hose con-
nection (10) and fasten it with a
hose clamp if necessary.
cut off the connection above and
attach the hose over the correct
connection
clamp).
• For the use of a tap connector
with internal thread (G 1") for
connecting external hose con-
nection systems, cut the top three
connections off directly over the
G 1" threaded pipe.
• Connect a tap connector with
internal thread (G 1 ½") directly
to the angle adapter (
start-up
to point
1
1
12).
performance data takes place
under optimal conditions, such as
adaptor (
stopper (
stopper (11) may be taken out of the angle
adaptor (12) (see
mended for hose connections smaller than
1". Please bear in mind that the water may
event of a power cut.
To erect/suspend
pended in the water.
delivery contents may be used to
suspend and/or extract the pump.
4
4
Fix the nylon rope (13) onto the car-
rying handle (1).
Ensure that the equipment is
not hung up or held by the
mains cable. There is a risk
of electric shock from dam-
aged mains cables.
Note that, over time, dirt and sand
may collect on the bottom of the
shaft, which could damage the
pump.
We recommend placing the pump
on a brick or a grid.
GB
IE
1
11) may reduce output.
-
13) contained in the
NI
-
-
9

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis