Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection; Cable Entry/Screwed Connection; Three-Phase Connection - Grundfos CRT Serie Montage- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für CRT Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 14

7. Electrical connection

The electrical connection should be carried out by an authorised
electrician in accordance with local regulations.
Warning
The CR pump must be connected to an external
mains switch placed close to the pump and to a
motor-protective circuit breaker or a CUE frequency
converter. It must be possible to lock the mains
switch in OFF position (isolated). Type and
requirements as specified in
EN 60204-1, 5.3.2.
Warning
Before removing the terminal box cover and before
removing/dismantling the pump, make sure that the
power supply has been switched off and that it
cannot be accidentally switched on.
The user is to consider whether it is necessary to
Caution
install an emergency stop switch.
The operating voltage and frequency are marked on the motor
nameplate. Make sure that the motor is suitable for the power
supply on which it will be used and the motor terminal connection
is correct. You will find a wiring diagram in the terminal box.

7.1 Cable entry/screwed connection

All motors are supplied without screwed cable entries. The table
below shows the numbers and sizes of cable entry holes of the
terminal box (standard: EN 50262).
Motor
Number and size
[kW]
of cable entries
0.25 - 0.55
2 x M20 x 1.5
0.75 - 3.0
2 x M20
4.0 - 7.5
4 x M25
2 x M20
11 - 18.5
4 x M40
Description
The holes have precast
threads and are closed with
knock-out cable entries
The holes are closed with
knock-out cable entries
The holes are closed with
knock-out cable entries
The holes are closed with
knock-out cable entries

7.2 Three-phase connection

Mains supply [V]
Delta connection
220-240
50 Hz
380-415
220-277
60 Hz
380-480
1)
60 Hz motors, 0.37 - 1.1 kW: 220-277/380-440 V.
W2
U1
W1
U2
V2
V1
Fig. 13 Delta connection
U1
U2
W2
V2
W1
V1
Fig. 14 Star connection
If the motor is provided with PTC sensors or PTO contacts, the
connection must be in accordance with the wiring diagram in the
terminal box.
Three-phase motors must be connected to a motor-protective
circuit breaker.
Star connection
/
380-415
/
660-690
1)
/
380-480
/
660-690
W2
U2
V2
U1
V1
W1
L
L
L
1
2
3
U2
V2
W2
U1
V1
W1
L
L
L
1
2
3
9

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Crt 2Crt 4Crt 8Crt 16

Inhaltsverzeichnis