Herunterladen Inhalt Inhalt Diese Seite drucken

ECOLAB Elados EMP III Typ E00 Betriebsanleitung Seite 112

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Maintenance
1.
Loosen attachment screws (pos. 1).
2.
Remove the cover plate (pos. 2) on the metering head (pos. 3).
3.
Prise out stopper (pos. 10) with screwdriver.
4.
Safeguard piston rod (pos. 9) from twisting with fork wrench SW 8.
5.
Twist out diaphragm (pos. 4), intermediate piece (pos. 8) and support disk (pos. 5).
6.
Remove fork wrench and turn diaphragm and intermediate piece as one unit until the
housing holes are aligned, and leakage hole (pos. 11) points downwards.nach unten
zeigt.
7.
The metering head should be evenly diagonally tightened.
417102233 Rev. 3-03.2019
Diaphragm and intermediate piece may need to be twisted in order to get
the piston rod wrench surface into the right position
Ensure that the attachment holes are aligned when tightening the
diaphragm and the intermediate piece.
CAUTION!
Only screw in the diaphragm by hand. (Do not use a tool!)
CAUTION!
Torque of the metering head screws = 6 ±1 Nm.
After 24 hours check the torque of metering head screws.
46

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iii typ e10

Inhaltsverzeichnis