Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation And Transport Guide - Dantherm CDT 30 MKII Servicehandbuch

Vorschau ausblenden Andere Handbücher für CDT 30 MKII:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 99

Preparation and transport guide

Introduction
Warning
Unpacking
4
This section is a guide to unpacking, preparation, transport and storage
If the machine has been transported lying down, allow it to stand upright for at least 1
hour before use.
Follow these steps for unpacking:
Step
Action
1
Open the top of the pack-
aging
2
Position the box vertically,
with the wheels at the bot-
tom
3
Extract the machine from
the box
4
Loosen the knobs, pull the
handle up to the desired
height and retighten the
knobs
5
Remove the protective foil on the control panel
www.dantherm-ltd.ru • info@dantherm-ltd.ru • +7 (495) 545-48-79
Москва. Каширский проезд д. 19 стр. 2
Illustration
Continued on next page

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cdt mkii seriesCdt 40 mkiiCdt 60 mkii

Inhaltsverzeichnis