Herunterladen Inhalt Inhalt Diese Seite drucken

Attaching / Disconnecting The Battery Pack To / From The Product; Checking The Battery Level; Changing Insert Tools; Torque Selection Ring / Drill Setting - Parkside PABSP 20-LI A1 Bedienungs- Und Sicherheitshinweise

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 61
Insert the power plug into the socket. The green
charge status LED
15
immediately, it turns off, at the same time red
charge status LED
16
ing operations, only red charge status LED
keeps glowing up.
The green charge status LED
red charge status LED
charging process is completed
Red LED flashes Battery defect
Green LED flashes Battery too cold or too
warm.
Attaching / Disconnecting the
battery pack to / from the
product
Inserting the battery pack:
Push the rotational direction switch / lock
into the middle position (lock) (see Fig.C).
Push and allow battery pack
connection slots completely and be clicked to it
(see Fig. B).
Removing the battery pack:
Press the release button
remove the battery pack

Checking the battery level

Press the battery level button
charge level of the battery pack (see Fig. E).
The status / remaining charge will be shown
on the battery level indication lights
3 RED lights glow = maximum charge level
2 RED lights glow = medium charge level
1 RED lights glows = low charge level

Changing insert tools

CAUTION! Battery pack
from tool prior to changing any insert tools.
Tool has a fully automatic spindle lock (see Fig. F).
When the motor is stopped, the gear train locks so
glows up for a second,
glows up. During charg-
16
lights up while
15
turns off that the
16
4
into the tool's
9
downward and
11
(see Fig. D).
9
to check the
10
.
12
must be removed
9
that the chuck
can be opened by turning it in
1
anti-clockwise
direction .
After desired tool has been attached and tightened
it by turning the chuck in clockwise
The spindle lock is automatically released when the
motor starts turning when pressing down On / Off
switch
.
5
Torque selection ring /
drill setting
Torque can be set by using the torque selection
ring
(see Fig. G).
2
Select a low level for small screw or driving
into soft materials
Select a high level for large / long screws or
hard materials or removing screws.
Select the drill setting for drilling works by set-
ting the torque selection ring
position (see Fig. H).

2-Speed gearbox

CAUTION! Only operate the gear speed
selector
when the tool is completely
3
stopped rotation. Otherwise the product
can be damaged
First gear – gear speed selector
position 1 (see Fig. I).
This setting is suitable for all screwing jobs.
Second gear – gear speed selector
to position 2.
This setting is more suitable for drilling works (see
Fig. J).
direction .
to to the drill
2
is switched to
3
is switched
3
GB
11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis