4. Information about Installation
Step 2:
Put a second positioning jig on the track. The exact location of the second jig
is determined by hanging the catenary wire. Important: Always use the moun-
ting eyelets on the side of the catenary wire, which are on the subsequently
continuous straight side on the bottom of the catenary wire. Always hang the
catenary wire on the pins, which are pointing to the mast.
28
Step 3:
Check with the catenary wire deviation jig to make sure that the catenary wire
is always within the two markings on the jig.