The chapter "Safety instructions" must be heeded.

6.1 Setting up for operation

Before the separator is put into operation, please make
sure that:
• the separator is clean and the interior is free from any ob-
jects which may have been placed inside during shipping
or installation.
• the separator is completely filled with clean cold water.
Completely filling the separator is complete when water
begins to drain from the outlet.

6.2 Initial Instructions

Placing the separator into full operation is normally handled
by a licensed tradesman although upon request can be hand-
led by a KESSEL representative.
The following personnel should be on hand when the initi-
al instructions for placing the separator into operation are
given:
• Building facilities manager
• Building maintenance workers
• Contracted plumber / tradesman
• Contracted disposal company
2019/02
Operation
What to do:
• 
C heck to make sure the separator is completely water-
tight. Check to make sure that during transport and ins-
tallation no damage to the separator was caused. Check
to make sure all connections to the separator (inlet, outlet,
refill, rinse pipes etc.) are in perfect working order.
• 
R epresentative should discuss all necessary information
regarding the disposal.
• 
R epresentative should take the customer step by step
through all stages of a separator disposal.
• 
A fter the separator has been emptied (disposed) all neces-
sary paperwork and documentation should be handed
over to the customer.
• 
T he separator should be returned to service by filling the
separator with fresh, cold water.
• 
H and-over of installation and user's manual.
The handover certificate will be provided to you by your
service provider

6.3 Completion of the commissioning report

After commissioning has been completed the separator
should be placed into normal operation mode.