Herunterladen Inhalt Inhalt Diese Seite drucken

Declaration Of Conformity - Elektror HRD 1T FU Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operating and assembly instructions HRD FU-ATEX

8 DECLARATION OF CONFORMITY

As manufacturer,
EN
Elektror airsystems gmbh
Hellmuth-Hirth-Strasse 2
D-73760 Ostfi ldern
herewith declares that the product, to which this declaration relates, complies with the following essential requirements
of the Machinery Directive (2006/42/EC).
Description of the partially completed machine:
ATEX high pressure blower HRD 1T FU, HRD 14T FU, HRD 16T FU, HRD 2T FU, HRD 60 FU, HRD 65 FU, HRD 7 FU
with the following designation:
The serial number and year of manufacture can be found on the rating place and the corresponding delivery note.
Description of the essential requirements of the directives, with which the partially completed machine complies:
Machinery Directive (2006/42/EC), Annex I, Articles 1.1.2, 1.1.3, 1.1.5, 1.3.2, 1.3.3, 1.3.4, 1.3.7, 1.5.1, 1.6.1, 1.7.1, 1.7.3
Electromagnetic Compatibility Directive (2014/30EC)
Directive on equipment and protective systems intended for use in potentially explosive atmospheres (2014/34/EC)
The partially completed machine described here continues to fulfi l the protective regulations of the Low Voltage Directive
(2014/35/EC) according to Annex I No. 1.5.1 of the Machinery Directive.
The commissioning of the partially completed machine is not permitted until it has been verifi ed that the machine in which the partially
completed machine is to be installed, complies with the provisions of the Machinery Directive (2006/42/EC).
The following harmonised standards have been applied:
DIN EN 12100
2011
ISO 14694
2003
DIN EN 1127-1
2011
DIN EN 13463-1
2009
DIN EN 13463-5
2011
DIN EN 14986
2007
DIN EN 60079-0
2014
DIN EN 60079-1
2015
DIN EN 60079-7
2007
20
As manufacturer, Elektror airsystems undertakes to forward the special technical documentation in respect of the partially completed
machine to national authorities at their request. The special technical documentation in respect of this partially completed machine
according to Appendix VII Part B has been created and is lodged with the "notifi ed body" EU No. 0637.
Person responsible for the documentation: Mr. Steffen Gagg, Tel. +49(0)711/31973-124.
Kreher (Managing Director)
Ostfi ldern, 02.05.2016
II2G c T3(T4) or
II3D c 125°C
Safety of machinery - General principles for design - Risk assessment and risk reduction
Industrial fans - Specifi cations for balance quality and vibration levels
Explosive atmospheres - Explosion prevention and protection - Part 1: Basic concepts and methodology
Non-electrical equipment for use in potentially explosive atmospheres -
Part 1: Basic concepts and requirements
Non-electrical equipment for use in potentially explosive atmospheres -
Part 5: Protection by constructional safety "c"
Design of fans working in potentially explosive atmospheres
Electrical apparatus for potentially explosive atmospheres
Part 0: Equipment - General requirements
Electrical apparatus for potentially explosive atmospheres
Part 1: Equipment protection by fl ameproof enclosures 'd'
Electrical apparatus for potentially explosive atmospheres
Part 7: Equipment protection by increased safety "e"
www.elektror.com

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis