This section describes the procedure for commissioning the
SUPERHUMMEL on site. In order to exclude the possibility of
damage and malfunctions, it is essential to proceed in the se-
quence outlined below.
CAUTION!
RISK OF INJURY and RISK OF PROPERTY DAMAGE:
Before working with the machine for the first time, operat-
ing staff must be adequately instructed!

4.1 PREPARING THE MACHINE

1
Unpack the machine cautiously. Pay attention to a non-
polluting disposal of the packing materials.
2
Insert the guide tube into the opening at the back of
the machine housing (Fig. 2, 1) and tighten the wing nut
(Fig. 2, 2).
3
Put the lower rod in the hole of the lifting fixture (Fig. 3, 1)
and fix them with the closure (Fig. 3, 2).
4
Lift the sanding drum off the floor by turning the lowering
lever at the handle upwards (Fig. 4).
5
Mount the cable support to the console at the top of the
guide tube (Fig. 5).
SUPERHUMMEL
01.05.2014
4

COMMISSIONING

Commissioning
Fig. 2
Insert the guide tube into the opening in the
machine housing (1). Tighten the wing nut (2).
Fig. 3
Put the lower rod in the hole of the lifting fixture
(1) and fix them with the closure (2).
Fig. 4
Lift the sanding drum off the floor by turning the
lowering lever at the handle upwards.
Fig. 5
Mount the cable support to the console at the
top of the guide tube.
ENGLISH
67