Herunterladen Inhalt Inhalt Diese Seite drucken

Special Maintenance; Decommissioning And Disposal - Palazzetti easytouch Anleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

12.3 SPECIAL MAINTENANCE

Palazzetti Authorised Service Centre once a year, preferably at the start of the season.
The purpose of such maintenance is to ensure all the components are in perfect working order.
If the control panel shows the
maintenance performed on the stove.
This warning can be reset temporarily by pressing the
The warning will be shown again until special maintenance is performed by the Authorised Service Centre, which
will also reset the operating hour counter.
Burn pot
Ash bin/Compartment
Glass
Heat exchanger
Ignition heater socket
Flue gas manifold
Door and burn pot gaskets*
Flue*
Fans*
(*) responsibility of the Authorised Service Centre.

13 DECOMMISSIONING AND DISPOSAL

Decommissioning and disposal of the stove are the exclusive responsibility of the owner,
who must act in accordance with the laws in force in the country where the stove is
installed with regards to safety and environmental protection.
The stove may also be dismantled and disposed of by companies authorised to recover
and dispose of the materials in question.
INSTRUCTION: always observe the standards in force in the country where the stove
is decommissioned as regards disposal of the materials and the waste disposal report
where required.
IMPORTANT: All dismantling operations for decommissioning the stove must be
performed when the stove is off and disconnected from the power supply.
- remove all electrical equipment;
- have the structure of the stove scrapped by an authorised company;
IMPORTANT: Dumping the stove in accessible areas represents a serious hazard to
people and animals.
Liability for any harm caused to people or animals always lies with the owner.
When decommissioning the stove the ce mark, this manual and other documents
relating to this stove must be destroyed.
USE AND & MAINTENANCE
symbols together, immediately contact the Service Centre to have special
INSPECTION AND/OR MAINTENANCE PLAN
WHENEVER
STARTED
X
cod. 004772532 - 07/2018 - Palazzetti - PN - Italy
button and then starting the stove again.
1 MONTH
6 MONTHS
WEEKLY
X
X
X
X
X
1 YEAR
X
X
X
55/13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ecofire idro

Inhaltsverzeichnis