Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Inspecting The Equipment; Unpacking The Cabinet; Ups Setup - Eaton Powerware 9140 Kurzanleitung

Vorschau ausblenden Andere Handbücher für Powerware 9140:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 45
Chapter 2

Inspecting the Equipment

Unpacking the Cabinet

UPS Setup

Installation

If any equipment has been damaged during shipment, keep the shipping cartons
and packing materials for the carrier or place of purchase and file a claim for
shipping damage. If you discover damage after acceptance, file a claim for
concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier
within 15 days of receipt of the equipment; 2) Send a copy of the damage claim
within 15 days to your service representative.
NOTE Check the battery recharge date on the shipping carton label. If the date has expired and the
batteries were never recharged, do not use the UPS. Contact your service representative.
S
Unpacking the cabinet in a low-temperature environment may cause condensation to occur in and on
the cabinet. Do not install the cabinet until the inside and outside of the cabinet are absolutely dry
(hazard of electric shock).
S
The UPS is heavy. A minimum of two people are required to remove the UPS from its carton.
To unpack the cabinet and accessories:
1. Cut the pallet straps and remove the large cardboard outer sleeve. Have two
people lift the sleeve for ease of removal.
2. The cabinet, batteries, and accessory kit are packaged in individual cartons. Do
not install the batteries until after the cabinet is installed in the rack.
Use care when moving and opening the cartons. Leave the components
packaged until ready to install.
3. Discard or recycle the packaging in a responsible manner, or store it for future
use.
The Powerware 9140 UPS comes with all hardware required for installation in a
standard EIA or JIS seismic rack-mount configuration with square and round
mounting holes. The rail assemblies adjust to mount in 48-cm (19-inch) panel racks
from 61 to 84 cm (24 to 33 inches) deep.

Rack Setup for the UPS

Refer to the user's guide on the CD if:
S
You are installing the optional seismic mounting brackets.
S
You are installing an EBM with the UPS.
S
You require detailed setup instructions.
EATON Powerware
C A U T I O N
®
9140 UPS (7.5–10 kVA) Quick Start
S
164201678 Rev 1
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis