57
The infiltration basin must not be accessed by construction vehicles.
EN
For the trench overflow, the sand and topsoil layer is recessed into a funnel shape.
This funnel is filled with coarse gravel (grain size 8/32) until the trench overflow is
covered.
Compression of the working area