System handover to the operator
NOTE
If there are temporal delays bet-
ween the installa-tion/commissio-
ning and handover to the operator,
a manual regeneration cycle must
be carried out.
The operator must be told about
the function, operation and checks
of the system. Give the installation
and operating instructions to the
operator.