Herunterladen Inhalt Inhalt Diese Seite drucken

Getting Started; Power Supply; Operation; On / Off - Pce Instruments Pce-Com 20 Bedienungsanleitung

Leitfähigkeitsmessgerät
Vorschau ausblenden Andere Handbücher für PCE-COM 20:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

4

Getting started

4.1

Power supply

The device is powered by the included AC mains adaptor (input: 100 ... 240 V AC; 50/60 Hz; output:
4.2 V DC / 1 A). The mains adaptor is connected at the bottom of the device. During operation, the
integrated 2200 mAh lithium battery can be used.
When the battery level is below 1/3, the device will emit two beep tones every 30 seconds to remind
you to charge the battery.
When the meter is connected to the power supply, a red LED on the adaptor will start glowing. It will
turn green when the battery is fully charged. A complete charging process takes five to six hours.
5

Operation

5.1

On / off

When the meter is switched off, press and hold the "
following start screen will be displayed (Image 1):
Now press the "MEAS" key to enter the measurement screen or wait until you are automatically
directed from the start screen to the measurement screen.
In order to switch off the device, press and hold the "
are saved automatically.
" key for two seconds to switch it on. The
Image 1
" key fort wo seconds. The settings made
© PCE Instruments
34
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pce-com 20-ica

Inhaltsverzeichnis