Herunterladen Inhalt Inhalt Diese Seite drucken

Post-Installation Check; Wiring - Endress+Hauser Rid14 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für RID14:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Wiring

 4
Mounting the field indicator on a pipe with the mounting bracket for pipe diameters 1.5 to 2.2"
1
Mounting plate
2
Mounting bracket
3
2 M6 nuts
4.4

Post-installation check

After installing the device, always run the following final checks:
Device condition and specifications
Is the device damaged?
Is the seal undamaged?
Is the device securely fastened to the wall or the mounting plate?
Is the front cover fixed tightly?
Does the device correspond to the measuring point specifications, e.g. ambient
temperature range etc.?
5
Wiring
WARNING
L
Danger of explosion if unit is connected incorrectly in hazardous area
When connecting Ex-approved devices please take special note of the instructions and
connection schematics in the Ex-specific supplement to these Operating Instructions. If you
have any questions, please do not hesitate to contact your E+H representative.
32
3.
3
1.
2.
2
1
RID14
A0011258
Notes
Visual inspection
Visual inspection
-
-
See ' T echnical data' section
Endress+Hauser

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis