Herunterladen Diese Seite drucken

Fronius OPT/i TPS 2 Installationsanleitung Seite 18

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

And finally...
3 Nm
1,5 Nm
18
7
1 0
8
4
5
3
4
4
3 Nm
Position the copper bracket over the
7
two plus sockets
Screw the 19 mm hexagon bolt from
8
the installation set scope of supply into
the 2nd plus socket:
copper bracket + washer + spring
washer
Screw the 19 mm hexagon bolt from
9
the original plus socket into the exis-
ting plus socket:
copper bracket + power cable + star +
1 1
washer + spring washer
9
Tighten the hexagon bolt on the 2nd
10
plus socket,
tightening torque = 15 - 35 Nm
Tighten the hexagon bolt on the exis-
11
ting plus socket,
tightening torque = 15 - 35 Nm
Move the connection plate into the
1
correct position
4
3 Nm
Fix the mains cable strain-relief device
2
in place
Insert the connection plate
3
Fix the connection plate in place with
4
the five TX25 screws
4
Attach the sticker (+)
5
1,5 Nm

Werbung

loading