Herunterladen Diese Seite drucken

Fronius OPT/i TPS 2 Installationsanleitung Seite 16

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installing the OPT/i TPS rear 2nd plus socket
Preparations
16
2
3
2
2
5
6
Switch off the power source and dis-
1
connect it from the mains
Remove the five TX25 screws
2
Fold the connection plate outwards
3
2
2
Undo the mains cable strain-relief
4
device on the connection plate using a
slotted screwdriver
Push the connection plate backwards
5
to increase the opening between the
power source and the connection
plate
4
Remove the blanking cover
6

Werbung

loading