Herunterladen Diese Seite drucken

Fronius OPT/i TPS 2 Installationsanleitung Seite 13

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installing the OPT/i TPS 2nd plus socket
Preparation
1
2
3
Installing the
OPT/i TPS 2nd
plus socket
Switch off the power source and disconnect it from the mains
Remove the right side panel from the power source
Remove the two TX25 screws on the control panel
1
Fold out the control panel
1
Remove the blanking cover
2
2
Fit the current socket into the cover
3
13

Werbung

loading