COMMISSIONING
After bound device successfully, the device enters the
four-step commissioning process.
Step 1: Internet Setup
Tap Internet Setup to start the network configuration.
• Wi-Fi
Select WiFi select the appropriate network and enter
the password.
• Ethernet
Connect the system to a router using a network cable
in the DHCP or Static mode.
- In the default DHCP mode, the device obtains IP
address automatically (recommended).
- In the Static mode, network administrator
(homeowner) should set a valid IP address to the
device. To avoid IP address conflict, check the
IP addresses of other devices on the network by
accessing router's settings.
• 4G
1. Install a nano SIM card to the EcoFlow 4G Dongle
ESS(EU).
2. Install the dongle onto the USB port (4G) of the
inverter.
3. Activate your SIM card through App.
For more details about EcoFlow 4G Dongle ESS(EU),
refer to the user manual of the 4G Dongle.
Step 2: Home Setting
Tap Home Setting to enter the corresponding house
address and set the electricity rate if needed.
Step 3: Device Setting
Tap Device Setting to verify that the devices in the
device list match the connected devices.
• Perform system check to comfirm connection
(during the initial commissioning)
• Update firmware (recommended)
• Set the grid code, system work mode, feed-in power
limitation, etc.
• Set connection parameters, voltage protection
parameters, etc. in Customize Settings.
Follow local regulations if you need to change any
of these parameters, and contact your local power
organization first.