9. Manual boiler venting is not necessary because the PRO 700 contains a professional anti-vacuum
valve, which automatically vents the boiler during the heat-up phase. This venting process is done by
way of the brew group, directly into the drip tray.
Caution: steam forms!
10. Please consider that the procedure described in the steps above is the same if the steam/ hot water
boiler is deactivated: also in this case the steam/ hot water boiler will be filled and the PID display
indicates the temperature in the steam/ hot water boiler.
11. The machine is now ready for use.
If the first filling does not work, connect the machine to the water supply (see the following
chapter). After the first filling, you can switch the machine back to water tank and continue
to operate the machine with it.
Before preparing the first coffee, please rinse the machine by extracting about 2-3 water
tank fillings from the brew group and the hot water wand. When the machine is switched
off, more hot water can be dispensed. See also chapter 6.4 Dispensing of hot water.
5.2 Machine in use with direct water connection (steam/ hot water boiler activated)
1. Please make sure that the valve at the bottom panel of the machine and the switch behind the drip
tray are in the correct position (see chapter 4.3, image 1 and 2).
2. Make certain that the pump pressure gauge indicates enough pressure.
3. Plug the machine into an electrical outlet.
4. Turn the machine on by placing the metal switch in the upper position. The green control lamp and the
PID display will come on and a pump noise will be heard. If there is still a pump noise, the filling of the
steam/ hot water boiler is still being completed.
Fill mode
The PID-display indicates "FIL". Now position the brew lever upwards for at least 30 seconds at a time
to fill the coffee boiler. The display indicates the time in seconds.
Move the lever back into the lower position. The "FIL" display turns off.
5. As soon as both boilers are filled with water, the pump will become quiet. The PID display and the
orange control lamp will illuminate. Both boilers are now being heated in succession whereby the
coffee boiler has priority.
6. Continue as described in chapter 5.1
Before preparing the first coffee, please rinse the machine by extracting about 5-8 l from
the brew group and the hot water wand. When the machine is switched off, more hot water
can be dispensed. See also chapter 6.4 Dispensing of hot water.
Only use the machine on a water-resistant surface.
High water pressure can result in damages to property and machine. Please make sure the water
pressure does not exceed 2 bar.
Portafilter, drip tray, drip grid and water tank are not suitable for the dish washer.
The PRO 700 has a fuse to prevent the machine from overfilling.
It is possible that the machine does not heat up when using it for the first time or when
dispensing large quantities of water through the hot water valve. In this case, please
switch the machine off and on again.
Translation of the original German user manual
ENGLISH
30