Commissioning / operation
7.3.1
Switching on the system
Requirements:
The system is completely set up
n
n
The building-side utilities are switched on:
– Power supply
– Compressed air supply
n
All components of the system are ready for operation.
Fig. 11: DryExxEco
elements
1.
Switch on the main switch
ð The signal lamp
ð The system starts up, which takes approximately 1 minute.
ð After successful system start-up, the "main screen" appears on the display
the control cabinet.
2.
If necessary, acknowledge the error message on the control unit display by pressing
the illuminated button
ð The error message on the display disappears.
ð The DryExx
ð The DryExx
present and a spraying phase is active.
Rev. 03-12.2023
®
Advanced-ETH - operating
at the control cabinet.
4
lights up.
2
.
2
®
system is ready for operation.
®
system will begin to operate as soon as an external enable is
48
S7 panel PLC with touch screen
1
Signal lamp, white: power "ON"
2
Illuminated button, blue: "fault reset"
3
Main switch
4
1
2
3
4
of
1