Commissioning / operation
7.2
Initial start-up
The initial start-up of the Plant is carried out by Ecolab service personnel.
If you have any questions, please contact your Ecolab F&B service partner.
After assembly and once all connections have been established as described in the
Ä Assembly and Installation , the system is ready for initial start-up.
chapter
Initial start-up is carried out in the following steps:
n
Perform valve assignment.
on page 41
n
Set general operating parameters.
parameters' on page 43
n
Set up circuit parameters.
on page 44
n
Bleed the lubrication circuits and check the system for correct operation.
7.2.4 'Bleeding lubrication circuits and checking the system for correct operation'
on page 46
When handing over the system to the customer, set up access passwords.
n
8.3.2 'Assigning PIN codes' on page 59
Rev. 03-12.2023
Ä Chapter 7.2.1 'Performing valve assignment'
Ä Chapter 7.2.2 'Setting general operating
Ä Chapter 7.2.3 'Entering circuit parameters.'
40
Ä Chapter
Ä Chapter