Herunterladen Diese Seite drucken

Rational iCombi Gas Umbauanleitung Seite 18

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
1 | MI_2156 Gas valve (hot air and steam) - dismantling and installation
5. Check the secure fit of the compensation line on the fitting (Fig. 1).
If the compensation line has slipped off the fitting only a few mm or even
completely, the compensation line must be replaced.
NOTICE! If the compensation line has to be replaced: make sure that the
compensation line is pushed all the way onto the two fittings!
1
6. The test result of step 5 is good:
Disconnect the compensation line (4) from the gas valve (1) only and leave
it connected to the blower (9).
18 / 156

Werbung

loading