Herunterladen Diese Seite drucken

Zodiac ZOOM 230 Roll Up Bedienungsanleitung Seite 28

Teil 2

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 42
1. Deflate the boat.
2. Replace the valve protections.
3. Remove oars and equipment.
4. Remove the floorboard (For Zoom S only - for models with a slatted floor, It is not necessary to
remove the slats to fold the boat).
5. Empty the boat of all water and sand by opening the self-bailers, dry it.
6. Fold in the 2 sides of the main buoyancy tube (A), fold the cones onto the transom, then
the boat around the transom (C). Start again if you feel there is still some air left in the tubes.
buoyancy tube
tube deflated
Stow the boat in its bag.
For some models with wooden or aluminium floorboard, stow the floorboard in its bag.
DEFLATING / FOLDING THE BOAT
A
floor
C
12
/ 12
roll up
B

Werbung

loading